HPC Map
Atlasresearch

Workspace

WorkspacePokedexHPC MapPortfolioCalendarTaiwan RevenueMemory
Calculators
  • 01AI Factory
  • 02CPO Stack
  • 03HBM Bridge
  • 04GPU Cloud TCO
  • 05Inference Tokens
  • 06Power Bottleneck
  • 07Custom ASIC
  • 08OCS TAM
  • 09N3 Allocation
  • 10Optical TAM
Agent APISubscribe
Sign in
HPC Map

HPC Co-location Map

Source-linked U.S. AI/HPC site map with MW-sized markers, operator filters, and facility tables.

8Companies35Seed sites

Jason's Chips

Subscribe or sign in with your Substack email for the full map, filters, site table, and source links.

Subscribe to Jason's ChipsSign in
Companies
Status
Visible capacity

21.68 GW

Gross power, estimated when needed

Sites

35

16 operating or contracted

Capacity basis
United States

Site Map

Solid: operating/contractedDashed: pipeline/evaluating
APLD
Site detail

Delta Forge 1

Alexandria, Rapides Parish, LA

APLD
Displayed MW
430 MW
Status
Contracted
Grid
MISO
Confidence
High confidence
City centroidHigh investment-grade U.S. hyperscalerExpected delivery dates across 1H27-1H28; initial operations expected in mid-2027.

Delta Forge 1 moved from pipeline to contracted after Applied Digital's April 23 lease disclosure. Location is mapped to Alexandria, Louisiana from the updated investor presentation; exact site coordinates are not public.

Capacity rows

Gross power

As of Jan 22, 2026

430 MW

Critical IT load

As of Apr 23, 2026

300 MW
Sources
Applied Digital April 23, 2026 Form 8-K Delta Forge 1 lease exhibitApr 23, 2026

Applied Digital disclosed a lease agreement with a new U.S.-based high investment-grade hyperscaler at Delta Forge 1.

Applied Digital Investor Presentation 2026Apr 23, 2026

Presentation identifies Delta Forge 1 in Alexandria, Louisiana with 300 MW contracted and 300 MW under construction.

Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory CampusJan 22, 2026

Company said Delta Forge 1 is designed to support 430 MW of total utility power and up to 300 MW of critical IT load.

Sources

Sites

35 rows
CompanySiteStatusDisplayed MWBasisCustomerConfidence
APLD

Delta Forge 1

Alexandria, Rapides Parish, LA

Contracted430 MWGross powerHigh investment-grade U.S. hyperscalerHigh confidence
APLD

Polaris Forge 1

Ellendale, Dickey County, ND

Contracted571 MWEstimated gross powerCoreWeaveHigh confidence
APLD

Polaris Forge 2

Harwood, Cass County, ND

Contracted429 MWEstimated gross powerInvestment-grade U.S. hyperscalerHigh confidence
BTDR

Clarington

Clarington, Monroe County, OH

Pipeline570 MWGross powerPotential colocation tenantsNeeds review
BTDR

Niles

Niles, Trumbull County, OH

Pipeline300 MWGross powerColocation / AI cloud pipelineNeeds review
BTDR

Rockdale

Rockdale, Milam County, TX

Evaluating179 MWGross powerPotential colocation / AI cloud tenantsNeeds review
CIFR

Barber Lake

Colorado City, Mitchell County, TX

Contracted800 MWGross powerFluidstack / Google backstopHigh confidence
CIFR

Black Pearl

Wink, Winkler County, TX

Contracted300 MWGross powerAmazon Web ServicesHigh confidence
CIFR

Colchis

San Angelo area, Tom Green County, TX

Pipeline1.0 GWGross powerPotential HPC tenantsNeeds review
CIFR

McLennan

Riesel, McLennan County, TX

Pipeline500 MWGross powerPotential HPC tenantsNeeds review
CIFR

Mikeska

Doole, McCulloch County, TX

Pipeline500 MWGross powerPotential HPC tenantsNeeds review
CIFR

Milsing

Singleton, Grimes County, TX

Pipeline500 MWGross powerPotential HPC tenantsNeeds review
CIFR

Odessa

Odessa, Ector County, TX

Mining only207 MWGross powerCipher self-miningHigh confidence
CIFR

Reveille

Cotulla, La Salle County, TX

Pipeline70 MWGross powerPotential HPC tenantsNeeds review
CIFR

Stingray

Andrews, Andrews County, TX

Contracted100 MWGross powerUndisclosed investment-grade hyperscalerNeeds review
CIFR

Ulysses

Southeastern Ohio, OH

Pipeline200 MWGross powerPotential HPC tenantsProvisional
CORZ

Auburn campus

Auburn, Lee County, AL

Available for lease43 MWEstimated gross powern/aNeeds review
CORZ

Austin site

Austin, Travis County, TX

Operating29 MWEstimated gross powerCoreWeaveNeeds review
CORZ

Dalton campus

Dalton, Whitfield County, GA

Under construction207 MWEstimated gross powerCoreWeaveHigh confidence
CORZ

Denton campus

Denton, Denton County, TX

Operating374 MWEstimated gross powerCoreWeaveHigh confidence
CORZ

Hunt County campus

Quinlan, Hunt County, TX

Available for lease430 MWGross powern/aNeeds review
CORZ

Marble campus

Marble, Cherokee County, NC

Operating93 MWEstimated gross powerCoreWeaveHigh confidence
CORZ

Muskogee campus

Muskogee, Muskogee County, OK

Contracted1.50 GWGross powerCoreWeaveHigh confidence
CORZ

Pecos campus

Pecos, Reeves County, TX

Available for lease1.50 GWGross powern/aHigh confidence
GLXY

Helios

Spur, Dickens County, TX

Operating1.63 GWGross powerCoreWeaveHigh confidence
HUT

Beacon Point

Nueces County, Nueces County, TX

Contracted1.0 GWGross powerHigh-investment-grade tenantHigh confidence
HUT

River Bend

St. Francisville, West Feliciana Parish, LA

Contracted1.0 GWGross powerFluidstack / Anthropic / Google-supported leaseHigh confidence
IREN

Childress

Childress, Childress County, TX

Contracted750 MWGross powerMicrosoft / NVIDIAHigh confidence
IREN

Kiowa

OK

Pipeline1.60 GWGross powerPotential AI infrastructure customersNeeds review
IREN

Sweetwater 1 & 2

Sweetwater, Nolan County, TX

Under construction2.0 GWGross powerNVIDIA strategic partnership focusHigh confidence
WULF

Abernathy HPC Campus

Abernathy, Hale County, TX

Contracted240 MWEstimated gross powerFluidstackHigh confidence
WULF

Chesapeake Data

Morgantown, Charles County, MD

Evaluating1.0 GWGross powerPotential HPC tenantsNeeds review
WULF

Justified Data / Hawesville

Hawesville, Hancock County, KY

Pipeline480 MWGross powerPotential HPC tenantsNeeds review
WULF

Lake Hawkeye

Lansing, Tompkins County, NY

Pipeline400 MWGross powerPotential HPC tenantsNeeds review
WULF

Lake Mariner

Barker, Niagara County, NY

Contracted750 MWGross powerCore42 / Fluidstack / GoogleHigh confidence